DR is a distance problem before it is a shopping problem. Far enough from your primary to survive the same incident, close enough that replication still works, on a different power feed and a different fibre path.
A second site you can fail over to.
Distance, latency, and what they cost you.
- Distance between sites
- Roughly 10–30 km across the Amsterdam metro: different substation, different flood zone, same time zone as your staff.
- Synchronous replication
- Comfortable under about 1 ms round-trip, so within the metro. Every added millisecond lands on your commit latency.
- Asynchronous replication
- Anything further. Your RPO becomes the replication lag, so measure the lag rather than trusting the brochure.
- Inter-site fibre
- Dark fibre or a wavelength between campuses, ordered through the operators. Ask for the duct route, not just the endpoints.
- Footprint
- From one rack of standby gear to a mirror of production. Most start small and grow after the first real test.
Four steps, from RTO to first failover test.
- 01Tell us what you needWhere your primary sits, your RTO and RPO, and what genuinely has to run after a failover.
- 02We engineer and negotiateWe pick a second campus on power feed, flood zone and fibre path, then price the link with the space.
- 03We fast-track the introductionBoth operators get the same brief, so the cross-campus fibre is quoted alongside the racks instead of two months later.
- 04You contract with the datacenterTwo contracts, two SLAs, one runbook. We stay on for the first failover test.
Not a backup product, and not a second rack next door.
Distance, replication mode and who fails over.
How far apart should the two sites be?
Far enough for a different power feed, fibre path and flood zone; close enough that synchronous replication still fits inside your write latency. Across the Amsterdam metro that is roughly 10 to 30 km.
Synchronous or asynchronous?
Synchronous if your database cannot lose a committed write and the round-trip stays near a millisecond. Asynchronous everywhere else, with your RPO set to the lag you can live with.
Can my primary stay in my own server room?
Yes, and plenty of placements start that way: keep the server room, put the recovery site in a datacenter, then move the primary later once the move is boring.
Who runs the failover?
You do. We help write the runbook, sit in the first test, and stay reachable as technical contact afterwards.
Where to go next.
Tell us where the primary is.
Your primary site, your RTO and your RPO. We come back within one business day with a distance, a replication mode and two candidate campuses.